|
SOLPROS Enhancing Sustainability Effectively
|
|
|
Ekoviikki commissioning phase in brief:Commissioning included full testing of all (7) solar subsystems which had been taken into operation. Solar control parameters and flow distribution/mass flow rate in collectors were checked and readjusted whenever necessary. Other tasks included e.g. aeration of collector loops, checking of antifreeze, etc.
clear influence on the solar output (+/- 30%)
Pictures from the Commissioning work May 2001 (source: SOLPROS)
ATT2 (top left), ESY (top right), Skanska 3 in May 2001.
Checking of control parameters and flow distribution in collectors. Keräinten säätöarvojen ja virtauksen tarkistus käynnissä. Keräimet toimivat ns. low-flow periaatteella, jolloin virtausnopeus on vain 20% perinteisesti käytetystä mitoitusarvosta.
The central heating room of VVO (l) and Skanska 3 (r). The heat exchanger, pump and control units are the central components. VVO (v) ja Skanska 3 (o) lämmönjakohuoneet. Aurinkolämpöjärjestelmän ydin koostuu lämmönvaihto-, pumppu- ja säätöyksiköstä. |
|
Send mail to solpros@kolumbus.fi with questions or comments about this web site.The
contents of this site may not be copied or otherwise commercially used without
prior agreement with SOLPROS AY.
Copyright © 2003-2006 SOLPROS AY, all rights reserved
|